Backorders enable Cosmic Frog’s network optimization engine (Neo) to fulfill customer demand in a later period than the period in which it was due, at a cost that you specify. Instead of forcing every unit to be delivered exactly on time, Neo can weigh the cost of serving late against the cost of the alternatives: building capacity for every peak, prebuilding and holding inventory, or leaving demand unserved. It helps answer questions such as:
A backorder is demand that is fulfilled in a modeled period later than its original due period.
Backordering is a permission, not a requirement. Neo can still serve demand on time, and it will choose late service only where this lowers the overall cost of the network or where it is the only way to serve the demand.
Backorders are set up with two new fields on the Customer Demand table and are reported in new fields on existing output tables as well as in a new output table, the Optimization Demand Backorder Summary. Backorders can also be combined with stepped costs to make the cost of late delivery depend non-linearly on how late the demand is served.
If you want to get going with backorders quickly, follow these steps:
Alternatively, you can also get started using Ada, Optilogic’s agentic AI, and ask her questions along the way. For example, start with a prompt like “Create a small Neo model which uses the backorder fields on the customer demand table in a scenario. Make sure that in this scenario part of the demand is served late”.
Many supply chains do not serve every order exactly when it is due. Customers often accept a delay, whether this is explicit (a contractual lead time or delivery window) or implicit (an order that gets shipped once stock arrives). Models that insist on 100% on-time service can overstate the capacity and inventory a network needs and can even be infeasible when a real network would simply deliver somewhat late.
Without backorders, the usual workaround is to leave demand optional (Demand Status = Consider) so that the model can drop what it cannot serve. This hides the difference between demand that is delivered late and demand that is lost altogether.
Backorders let Neo treat late delivery as an optimization decision with its own cost. Late service is then evaluated together with production, sourcing, inventory, and transportation decisions, rather than as a manual after-the-fact adjustment. The outputs quantify how much demand is served late, how late it is, and what this costs.
Use backorders when customers can accept a delay and you want Neo to decide whether, how much, and how late demand should be served. The following are common situations where backorders may be appropriate:

Rule of thumb question: Is serving demand late a real option that I want Neo to evaluate, with a cost I can put a number on?
Backorders are configured on each applicable record of the Customer Demand table. Two new fields are available:

Combining the two fields gives the following behavior:

The backorder fields do not introduce a separate time unit. Lateness is counted in model periods, not days. With weekly periods, one period late means one week late; with monthly periods it means one month late. Periods of unequal length still count as one period each. Use a period structure that matches the lateness granularity that is meaningful for your business.
A multi-period model is required, because late deliveries need later periods in which to be served. The last period in which demand can be served late is the earlier of: the original demand period plus Maximum Backorder Periods, and the final period of the model (see Handling the End of the Model Horizon).
Demand does not need to be set to Consider to allow backorders. As soon as a Per Unit Backorder Cost or Maximum Backorder Periods > 0 is set, backorders are automatically allowed. How Demand Status interacts with this is as follows:
When Per Unit Backorder Cost is a number, the backorder cost is calculated as:
Backorder cost = late quantity (/volume/weight) × Per Unit Backorder Cost × periods late
On-time deliveries incur no backorder charge. If one demand record is split over several delivery periods, the cost is calculated separately for each late portion, and the results are added up. Backorder cost is an additional modeled cost; it does not replace production, inventory, transportation, or other costs.
Consider the following details of a simple example model:

With a Per Unit Backorder Cost of 10 and a Maximum Backorder Periods of 3, the optimal solution delivers 150 units in P1, 50 in P2, and 350 in P5:

All 550 units are served, 350 of them late, and none are unserved. Total backorder cost is $7,500.
Instead of a number, you can enter a Step Cost Name in the Per Unit Backorder Cost on the Customer Demand table, and define that named schedule in the Step Costs table. This is useful when the cost of lateness is not constant per period, for example when late fees escalate the longer a customer waits.
When Step Costs are used for backorders, Throughput Level is a breakpoint in the number of periods late (1, 2, 3, …), not a quantity breakpoint. For example, consider a step cost named BO_SteppedCost specified on the Step Costs table as follows:

Next, set Per Unit Backorder Cost = BO_SteppedCost on the relevant Customer Demand records. Maximum Backorder Periods can optionally be used in addition to limit how late the demand can be served; the step cost schedule itself does not limit backordering.


The Step Cost Behavior of the schedule determines how the costs are applied. The three behaviors work as follows:
For the BO_SteppedCost schedule above (cost 10, 20, 30 for throughput level 1, 2, 3), the cost for one unit delivered 1, 2, or 3 periods late is:

Please note:
Scenarios using these stepped costs with the 3 different step cost behaviors result in the same late quantities and delivery periods as the numeric example above: 50 units delivered three periods late and 300 units delivered two periods late. Backorder costs are then calculated as follows:

In all 3 scenarios 550 units are served, of which 350 late. Different cost structures can lead to different delivery timing and backorder costing decisions in other models and scenarios; in this example the plan happens to stay the same.
Backorders add new fields to two existing output tables and introduce a new output table.



This new output table connects the original demand period with the period in which the late delivery happens. Each record describes one late delivery, defined by its scenario, customer, product, service mode, original due period, and delivery period. A demand split across several delivery periods therefore appears as several records. On-time deliveries do not appear in this table.


For one scenario and a consistent customer, product, and service mode scope:
Each late quantity appears once for its combination of demand and delivery periods, regardless of how many periods late it is. For example, 50 units delivered three periods late counts as 50 backordered, not 150. The table records late fulfillment rather than an ending backlog balance for each period. Demand that is ultimately left unserved does not appear in this table and needs to be tracked separately.
Backorders change when demand may be fulfilled. They do not waive the product’s maturation, expiry, inventory, production, or transportation rules. Three timing checks all need to hold for a late delivery to happen:
The production period counts as product age 1. Product made in P5 is age 2 in P6 and age 3 in P7. Maturation Time and Shelf Life are time quantities that are converted to period counts (for details see this Help Center article); they are not automatically the same as Maximum Backorder Periods. A product made in P5 and delivered in P6 is age 2, while P3 demand delivered in P6 is 3 periods late. These values describe different things.
Maximum Backorder Periods limits delivery independently of maturation. Demand can only be served late up to its maximum, so supply that needs to mature and only becomes usable after that point cannot be used for it. Extending the model calendar alone does not change this. Either the allowed delay needs to increase, if customers can genuinely accept it, or an earlier usable source of supply is needed.
Backorders do not extend shelf life or restart the age of inventory. A late delivery still needs usable product at the time it is delivered, and waiting may cause existing stock to expire. Later production may be needed instead.
Similar interactions can occur with other bottlenecks. For example, if product is made early but there is a transportation bottleneck, late demand can only be served from product that is still within its shelf life when it finally ships. If demand may be served 5 periods late but shelf life is 2 periods, the product needs to be produced in the period it is delivered or the period before (age = 1 in period of production).
The last period in which demand can be served late is the earlier of: original due period + Maximum Backorder Periods, and the final modeled period. A blank maximum means no limit within the horizon, but never beyond it. Consider a model with periods P1–P6:

Demand due in the last periods of the model is the most affected. Some of it may only be servable after the final period, for example because the network is capacity constrained at the end of the horizon, or because lead times or maturation push usable supply beyond the last modeled period. Neo cannot deliver this demand late, because there are no periods left to deliver it in. If this demand has Demand Status = Include, the model becomes infeasible. There are two main ways to handle this:
If the issue is that demand cannot be served in time because the supply is simply not there, two further options apply:
As a more general rule, avoid ending a model in a peak season. The end of the horizon is where demand has the least room to be served late, so a peak there forces Neo to serve it on time or not at all. Where possible, end the model in a period with slack capacity, where late service is unlikely to be needed.
No additional model option is required. Backorders are allowed on every Customer Demand record that has a Per Unit Backorder Cost or a Maximum Backorder Periods > 0.
Leave the backorder fields blank in the Baseline scenario, and use scenario items to populate Per Unit Backorder Cost and Maximum Backorder Periods in the scenarios that allow backorders. Running scenarios with different maximum delays (0, 1, 2, …) quantifies the value of customer flexibility.
When Demand Status = Consider, the cost to serve (including the backorder cost) is compared against revenue. If backorder costs plus other costs exceed revenue, Neo will choose not to serve the demand. Ensure products have realistic prices and compare the Unserved Demand Quantity between scenarios.
Enabling backorders does not give older (earlier due) demand priority. Neo decides which demand is served late based on the overall cost. If service priorities matter, they need to be modeled explicitly, for example by using stepped backorder costs which increase by period.
Filter the Optimization Demand Backorder Summary by scenario, and sort by Backorder Cost or Periods Late to quickly see which customers and products are affected most.

The following Help Center articles cover several modeling concepts touched upon in this article in more detail:
Please reach out to our Support team on support@optilogic.com for any questions or feedback.
Backorders enable Cosmic Frog’s network optimization engine (Neo) to fulfill customer demand in a later period than the period in which it was due, at a cost that you specify. Instead of forcing every unit to be delivered exactly on time, Neo can weigh the cost of serving late against the cost of the alternatives: building capacity for every peak, prebuilding and holding inventory, or leaving demand unserved. It helps answer questions such as:
A backorder is demand that is fulfilled in a modeled period later than its original due period.
Backordering is a permission, not a requirement. Neo can still serve demand on time, and it will choose late service only where this lowers the overall cost of the network or where it is the only way to serve the demand.
Backorders are set up with two new fields on the Customer Demand table and are reported in new fields on existing output tables as well as in a new output table, the Optimization Demand Backorder Summary. Backorders can also be combined with stepped costs to make the cost of late delivery depend non-linearly on how late the demand is served.
If you want to get going with backorders quickly, follow these steps:
Alternatively, you can also get started using Ada, Optilogic’s agentic AI, and ask her questions along the way. For example, start with a prompt like “Create a small Neo model which uses the backorder fields on the customer demand table in a scenario. Make sure that in this scenario part of the demand is served late”.
Many supply chains do not serve every order exactly when it is due. Customers often accept a delay, whether this is explicit (a contractual lead time or delivery window) or implicit (an order that gets shipped once stock arrives). Models that insist on 100% on-time service can overstate the capacity and inventory a network needs and can even be infeasible when a real network would simply deliver somewhat late.
Without backorders, the usual workaround is to leave demand optional (Demand Status = Consider) so that the model can drop what it cannot serve. This hides the difference between demand that is delivered late and demand that is lost altogether.
Backorders let Neo treat late delivery as an optimization decision with its own cost. Late service is then evaluated together with production, sourcing, inventory, and transportation decisions, rather than as a manual after-the-fact adjustment. The outputs quantify how much demand is served late, how late it is, and what this costs.
Use backorders when customers can accept a delay and you want Neo to decide whether, how much, and how late demand should be served. The following are common situations where backorders may be appropriate:

Rule of thumb question: Is serving demand late a real option that I want Neo to evaluate, with a cost I can put a number on?
Backorders are configured on each applicable record of the Customer Demand table. Two new fields are available:

Combining the two fields gives the following behavior:

The backorder fields do not introduce a separate time unit. Lateness is counted in model periods, not days. With weekly periods, one period late means one week late; with monthly periods it means one month late. Periods of unequal length still count as one period each. Use a period structure that matches the lateness granularity that is meaningful for your business.
A multi-period model is required, because late deliveries need later periods in which to be served. The last period in which demand can be served late is the earlier of: the original demand period plus Maximum Backorder Periods, and the final period of the model (see Handling the End of the Model Horizon).
Demand does not need to be set to Consider to allow backorders. As soon as a Per Unit Backorder Cost or Maximum Backorder Periods > 0 is set, backorders are automatically allowed. How Demand Status interacts with this is as follows:
When Per Unit Backorder Cost is a number, the backorder cost is calculated as:
Backorder cost = late quantity (/volume/weight) × Per Unit Backorder Cost × periods late
On-time deliveries incur no backorder charge. If one demand record is split over several delivery periods, the cost is calculated separately for each late portion, and the results are added up. Backorder cost is an additional modeled cost; it does not replace production, inventory, transportation, or other costs.
Consider the following details of a simple example model:

With a Per Unit Backorder Cost of 10 and a Maximum Backorder Periods of 3, the optimal solution delivers 150 units in P1, 50 in P2, and 350 in P5:

All 550 units are served, 350 of them late, and none are unserved. Total backorder cost is $7,500.
Instead of a number, you can enter a Step Cost Name in the Per Unit Backorder Cost on the Customer Demand table, and define that named schedule in the Step Costs table. This is useful when the cost of lateness is not constant per period, for example when late fees escalate the longer a customer waits.
When Step Costs are used for backorders, Throughput Level is a breakpoint in the number of periods late (1, 2, 3, …), not a quantity breakpoint. For example, consider a step cost named BO_SteppedCost specified on the Step Costs table as follows:

Next, set Per Unit Backorder Cost = BO_SteppedCost on the relevant Customer Demand records. Maximum Backorder Periods can optionally be used in addition to limit how late the demand can be served; the step cost schedule itself does not limit backordering.


The Step Cost Behavior of the schedule determines how the costs are applied. The three behaviors work as follows:
For the BO_SteppedCost schedule above (cost 10, 20, 30 for throughput level 1, 2, 3), the cost for one unit delivered 1, 2, or 3 periods late is:

Please note:
Scenarios using these stepped costs with the 3 different step cost behaviors result in the same late quantities and delivery periods as the numeric example above: 50 units delivered three periods late and 300 units delivered two periods late. Backorder costs are then calculated as follows:

In all 3 scenarios 550 units are served, of which 350 late. Different cost structures can lead to different delivery timing and backorder costing decisions in other models and scenarios; in this example the plan happens to stay the same.
Backorders add new fields to two existing output tables and introduce a new output table.



This new output table connects the original demand period with the period in which the late delivery happens. Each record describes one late delivery, defined by its scenario, customer, product, service mode, original due period, and delivery period. A demand split across several delivery periods therefore appears as several records. On-time deliveries do not appear in this table.


For one scenario and a consistent customer, product, and service mode scope:
Each late quantity appears once for its combination of demand and delivery periods, regardless of how many periods late it is. For example, 50 units delivered three periods late counts as 50 backordered, not 150. The table records late fulfillment rather than an ending backlog balance for each period. Demand that is ultimately left unserved does not appear in this table and needs to be tracked separately.
Backorders change when demand may be fulfilled. They do not waive the product’s maturation, expiry, inventory, production, or transportation rules. Three timing checks all need to hold for a late delivery to happen:
The production period counts as product age 1. Product made in P5 is age 2 in P6 and age 3 in P7. Maturation Time and Shelf Life are time quantities that are converted to period counts (for details see this Help Center article); they are not automatically the same as Maximum Backorder Periods. A product made in P5 and delivered in P6 is age 2, while P3 demand delivered in P6 is 3 periods late. These values describe different things.
Maximum Backorder Periods limits delivery independently of maturation. Demand can only be served late up to its maximum, so supply that needs to mature and only becomes usable after that point cannot be used for it. Extending the model calendar alone does not change this. Either the allowed delay needs to increase, if customers can genuinely accept it, or an earlier usable source of supply is needed.
Backorders do not extend shelf life or restart the age of inventory. A late delivery still needs usable product at the time it is delivered, and waiting may cause existing stock to expire. Later production may be needed instead.
Similar interactions can occur with other bottlenecks. For example, if product is made early but there is a transportation bottleneck, late demand can only be served from product that is still within its shelf life when it finally ships. If demand may be served 5 periods late but shelf life is 2 periods, the product needs to be produced in the period it is delivered or the period before (age = 1 in period of production).
The last period in which demand can be served late is the earlier of: original due period + Maximum Backorder Periods, and the final modeled period. A blank maximum means no limit within the horizon, but never beyond it. Consider a model with periods P1–P6:

Demand due in the last periods of the model is the most affected. Some of it may only be servable after the final period, for example because the network is capacity constrained at the end of the horizon, or because lead times or maturation push usable supply beyond the last modeled period. Neo cannot deliver this demand late, because there are no periods left to deliver it in. If this demand has Demand Status = Include, the model becomes infeasible. There are two main ways to handle this:
If the issue is that demand cannot be served in time because the supply is simply not there, two further options apply:
As a more general rule, avoid ending a model in a peak season. The end of the horizon is where demand has the least room to be served late, so a peak there forces Neo to serve it on time or not at all. Where possible, end the model in a period with slack capacity, where late service is unlikely to be needed.
No additional model option is required. Backorders are allowed on every Customer Demand record that has a Per Unit Backorder Cost or a Maximum Backorder Periods > 0.
Leave the backorder fields blank in the Baseline scenario, and use scenario items to populate Per Unit Backorder Cost and Maximum Backorder Periods in the scenarios that allow backorders. Running scenarios with different maximum delays (0, 1, 2, …) quantifies the value of customer flexibility.
When Demand Status = Consider, the cost to serve (including the backorder cost) is compared against revenue. If backorder costs plus other costs exceed revenue, Neo will choose not to serve the demand. Ensure products have realistic prices and compare the Unserved Demand Quantity between scenarios.
Enabling backorders does not give older (earlier due) demand priority. Neo decides which demand is served late based on the overall cost. If service priorities matter, they need to be modeled explicitly, for example by using stepped backorder costs which increase by period.
Filter the Optimization Demand Backorder Summary by scenario, and sort by Backorder Cost or Periods Late to quickly see which customers and products are affected most.

The following Help Center articles cover several modeling concepts touched upon in this article in more detail:
Please reach out to our Support team on support@optilogic.com for any questions or feedback.